How to join two pistons: procedure, advantages, and limitations

The large photo at the top shows two joined pistons; the joint is there, but it is extremely difficult to see!

Joining two pistons involves connecting two cylinder and plunger sections using a precision mechanical coupling. This allows for a travel distance that would otherwise be unachievable with a single-piece piston—whether due to constraints in transporting or handling the unit, or limitations in installing it within the designated space.

While this is a well-established solution for hydraulic elevators with long travel distances, it requires careful design and structural calculation.
If applied to an existing installation, it should be noted that, under Italian law (DPR 162/1999), any change to the travel distance is considered a structural modification, which necessitates an extraordinary inspection of the system.

What it means to join two piston sections

Joining two sections of a hydraulic elevator piston involves connecting the modules that make up the system’s cylinder and plunger, both mechanically and hydraulically, directly within the elevator pit at the bottom of the shaft.

For installations with long travel distances or in buildings with space constraints, hydraulic pistons are designed in multiple pieces (piston segments or modules).
A single, full-length piece would be impossible to transport by road or to maneuver safely within the elevator shaft; this is why joining the sections is necessary.

How is the joining process carried out?

The operation requires extreme precision and involves two distinct parts of the piston:

The plunger (the internal moving part):

  • This is joined using a precision threaded connection (male-female).
  • During assembly—typically performed with the aid of hoists and safety clamps—the seating surfaces are thoroughly cleaned, and structural adhesives or anaerobic sealants are applied to the threads.
  • Controlled screwing maneuvers are executed to ensure the components seat perfectly against one another, avoiding any misalignments or “steps” that could damage the seals.

The cylinder (the fixed outer casing):

  • This is connected using threaded collars or sleeves.
  • It is crucial to install intact, lubricated sealing rings to prevent oil leakage under pressure.

Testing and Inspection

Once the mechanical connection is complete, the system undergoes a pressure test to ensure there is absolutely no oil leakage, and that the assembly is perfectly vertical and operates smoothly, before the elevator is finally put into service.

Increasing the travel distance of an existing lift system: regulatory requirements

Increasing the travel distance of an existing hydraulic lift (for example, by extending it to serve an additional floor) is not merely a maintenance task; it constitutes a significant (or substantial) structural modification.

In Italy, the relevant regulatory framework is established by Presidential Decree (DPR) no. 162 of April 30, 1999 (as subsequently amended, including by DPR 23/2017, which incorporates the Lifts Directive), as well as by specific technical standards in the UNI 10411 series—notably UNI 10411-2 for hydraulic systems that do not comply with the Directive, or UNI 10411-12 for those that do.

These standards define the requirements for structural safety, necessary calculations, and mandatory upgrades (e.g., regarding headroom, pit depth, safety valves, landing door locks, and safety devices for the new floor).

Step-by-step procedure and notification to the competent authority

The bureaucratic and technical process for formalizing an increase in travel distance involves a series of specific, sequential steps:

  1. Feasibility study and technical design
    Action required: The maintenance company or a qualified engineer must assess technical feasibility (including available space in the lift shaft, the adequacy of the power unit and the new piston/piping, and the structural integrity of the building).
    Regulatory reference: The design must be prepared in accordance with the UNI 10411 standards, incorporating a risk assessment and calculations of the new loads and stresses placed on the system.
  2. Execution of the Work
    What to do: The specialized company carries out the physical work (e.g., installing a new piston section or replacing the entire piston, extending the guide rails, adding doors at a new floor level, or wiring safety circuits).
  3. Extraordinary Inspection (Mandatory)
    What to do: Once the work is complete—and before the system is reopened to the public or residents—the owner (or the building manager) must engage a Notified Body (or an entity authorized by the Ministry under Presidential Decree 162/99) to conduct an extraordinary conformity inspection.
    Outcome: The inspection body reviews the calculations, checks the safety devices, and tests the modified system. If the outcome is positive, they issue an extraordinary inspection report.
  4. Notification to the Relevant Authority (The Municipality)
    Lifting systems are registered with the municipal administration under a specific serial number. Any significant modification must be reported to the Municipality.
    Where to send it: To the competent local Municipality (usually via the “Single Desk for Productive Activities” — SUAP, for commercial/industrial properties; or via the “Single Desk for Building” — SUE, or other dedicated online portals for residential buildings).
    Who must submit it: The property owner or the building manager (often with the assistance or technical authorization of the installation company).
    Timeline: The notification and submission of documents must take place immediately after passing the extraordinary inspection, and either before or at the time the system is put back into service (depending on the specific procedures of the relevant municipal online portal).
  5. Documents to be attached to the notification
    The submission (whether electronic or in paper format) to be provided to the Municipality must generally include:

    • The report of a successful extraordinary inspection, issued by a Notified Body.
    • A declaration of conformity (or compliance) for the work, issued by the authorized installation or maintenance company.
    • Identification details of the lift (existing municipal registration number) and a description of the modification carried out (e.g., an increase in travel distance or the addition of a new landing/stop).
    • Any updated technical documentation
  6. Updating the Lift Logbook (Libretto di Impianto)
    Required action: All documents relating to the intervention, including the new extraordinary inspection report and relevant certifications, must be attached to and recorded in the lift’s logbook. This logbook serves as the official technical history of the installation and must be kept on-site, available for inspection by the relevant authorities.

Important note on liability: Placing a lift into service following a significant modification (such as an increase in travel distance) without first undergoing an extraordinary inspection and updating the records with the Municipality exposes the owner (or the condominium, represented by its administrator) to administrative penalties and the immediate suspension of the lift’s operation. Furthermore, in the event of an accident, this may lead to serious civil and criminal liability.

Technical procedure, step by step:

  1. Survey of the installation and design data.
  2. Calculation-based verification of the piston rod and cylinder (pressures, buckling load) in accordance with UNI EN 81-50:2020.
  3. Selection of the joint type and machining of the two sections.
  4. Pressure testing of the joined piston.
  5. Installation in the elevator shaft and alignment check relative to the guide rails.
  6. Extraordinary inspection by the authorized body (for existing installations).

Advantages of a jointed piston

Easier transport and handling, installation in existing shafts, and the possibility of longer travel distances.

Limitations and points to consider:

  • Critical alignment, buckling load verification, and inspection of seals in the joint area.
  • When an alternative might be preferable: telescopic piston or indirect suspension.

Frequently Asked Questions – FAQ

Q: Can a piston already installed in a system be joined (extended)?

A: Generally, the joining process is performed in the workshop on the piston sections, not directly on-site. For an existing system, it is evaluated on a case-by-case basis whether to replace the existing piston with a longer, joined version.

Q: Does increasing the travel (stroke) of an elevator require an extraordinary inspection?

A: Yes. Presidential Decree (DPR) 162/1999 classifies a change in travel as a structural modification—not routine maintenance—meaning the system must undergo an extraordinary inspection.

Q: Is a joined piston less safe than a single-piece piston?

A: No, provided that the joint is correctly designed, calculated, and tested in accordance with the UNI EN 81-50 standard. The critical factor is the alignment of the two sections, which must be verified during both production and installation. If you would like further assurance, please contact us to speak directly with our technical department.

Q: What is the maximum travel achievable with a joined piston?

A: This depends on several factors; however, for hydraulic elevators, the maximum travel typically achievable with a joined piston is around 20–21 meters (corresponding to approximately 6–7 floors).

Do you have a system with insufficient travel?

Send us the details, and we will work with you to evaluate a solution.
Contact us


    CONTACT US

    You would like to download our brochures? Sign up with your email, we promise that we will not send you annoying advertisements.